To reduce the concrete slab thickness, a sheet metal product such as ‘Bondek’ can be laid as not only the formwork but also a structural component. This steel sheet product is designed to take the pouring and curing loads of concrete and is very strong.
‘Bondek’ can reduce slab thickness hence reducing concrete costs. This sheeting is not removed and remains in the structure for the life of the building.
Free Handover Checklist
Build you new home with confidence
Moving into a new home? Don’t miss a thing. Our free handover checklist helps you inspect every detail before you sign off.


