1. Summary
This Summary MUST be read in full in conjunction with the rest of the Report. If there is a discrepancy between the information provided in this Summary and the body of the Report, the information in the body of the Report shall take precedence. Please read the Terms and Conditions
1.1 Summary of Observations
General Impression:-
The property is a detached lowset house and is approximately 90 years old. The property appears to have been constructed to an acceptable standard for the period using workmanship and materials of an acceptable quality and has since been reasonably maintained.
Key Findings:-
- Structural Damage - No evidence found
- Timber Pest Activity - Evidence was found in these areas:
- Conditions Conducive to Structural Damage - Evidence was found in these areas:
- Conditions Conducive to Timber Pest Activity - Evidence was found in these areas:
Risk of Hidden Defects and/or Timber Pests:-
Due to the design of the building, obstructions and the level of access afforded the Consultant, the risk of defects and/or timber pests being present and not reported on is considered High.
Susceptibility to Termites:-
In the Consultant's opinion, the building's susceptibility to timber pests at the time of inspection is High.
NOTE: This is a rating of the "susceptibility" of the building to termites or the "termite pressure" on the building. It should be viewed as the priority an owner should give to installing and maintaining a termite management system rather than an indication of whether or not termites are present.
Next Timber Pest Inspection:-
Following this inspection, the next inspection to help detect timber pest activity is recommended in 3 Months.
NOTE: The higher the susceptibility, the greater the frequency of recommended timber pest inspections.
Detailed Defect Reporting:-
The detailed reporting of any defect found during the inspection is shown under the relevent heading in the body of the report. The client should be aware that the absence of defect details under any individual heading is an indication that the area has been inspected and that no defects were observed. If for any reason an area is not able to be inspected this will be documented in the "Areas Not Inspected" section at the start of each major section.
Minor Defect Reporting:-
The Australian Standard AS4349.1 requires the inspector to compare the home with a typical home of the same type and age. Because this home is older, minor normal wear and tear defects are not usually documented individually. The client should appreciate that ongoing maintenance of the home including repairing minor defects may involve significant expenditure.
Defect Causes and Cost of Repair:-
This Standard Property Inspection and Timber Pest Detection Report does not establish the causes of defects identified, nor the options and associated costs of remedial work. For this, an appropriate specialist should be consulted.
Thermal Imaging:-
A thermal imaging camera is used on all inspections. Any images that assist the client in understanding a defect are included against the individual defect. The client should be aware that thermal images are not included in this report unless they are relevent to the documentation of a defect.
Actions You Should Take:-
Any recommendations made in this Report should be implemented prior to purchase, including establishing the extent of any work required and associated costs.
1.2 Service Agreement Details
Agreement Number | I052912 |
Date of Service Agreement | 15/01/2020 |
As requested and agreed with the Client, the inspection carried out by a qualified Building Consultant and Timber Pest Detection Consultant ("The Consultant") is a combined Standard Property Inspection and Timber Pest Detection Report ("The Report").
The Consultant provides an objective opinion about the condition of the property at the time of inspection.
1.3 Client Details
Client Name | John Smith |
Client Address | Client Home, Coorparoo, QLD, |
Client Email Address | smith@optusnet.com.au |
Client Telephone | (W) (M) 0499 999 999 (H) |
1.4 Special Conditions / Instructions
1.5 Consultant Details
Consultant Name | Fred Jones |
Company Licence # | 1009032 |
Company Name | Australian Building Inspection Services Pty. Ltd. |
Postal Address | 17 Riverside Terrace, WINDAROO, QLD, 4207 |
Company Email | mailto:info@abis.com.au |
Company Telephone | 07 3804 1000 |
|
Important Note
Often it is very difficult to fully explain situations, problems, access restrictions, building faults or their importance in a manner readily understandable by the reader. Should you have any difficulty in understanding anything contained within this Report, you should contact the contact ABIS on 07 3804 1000 to have the matter explained.
2. General Property Description
The records of the appropriate local authority should be checked to determine or confirm whether the ground on which the building rests has been filled, is liable to subside, is subject to landslip or tidal inundation, or if it is flood prone.
If the property has a strata title, the records of the body corporate should be searched for reference to any significant defects to or issues with the common property.
General Description of the PropertyBuilding Type & Approximate Age | The property is a detached lowset house and is approximately 90 years old |
Number of Storeys | One |
Additions, Improvements & Extensions | - Detached Garage
The client should ensure that all additions and improvements have been made by an appropriate QBCC licence holder and that the necessary local government approvals are in place.
WARNING: Recent repairs and/or repainting may conceal defects that will only become apparent with the passage of time.
|
Overall Quality of Construction & Level of Maintenance | The property appears to have been constructed to an acceptable standard for the period using workmanship and materials of an acceptable quality and has since been reasonably maintained. |
Building Position on Site | Towards the front of a small block |
Site Gradient | Gently sloping |
Site Access | Easy pedestrian and vehicular access |
Prevailing Weather Conditions at the Time of Inspection | Damp after rain |
Site Drainage | Appears adequately drained |
Smoke Detectors | Were fitted, but not tested
IMPORTANT NOTE: The Consultant cannot comment on the installation/testing requirements of smoke detectors as this is a specialist safety critical task that is not within the scope of this inspection and report.
It is strongly recommended that the client obtains advice from a suitably qualified person to either install the adequate amount of smoke detectors and/or ensure existing smoke detectors are of the required type and are installed and maintained correctly. See Smoke Detectors FAQ |
Orientation Statement | The Consultant may use compass points in the report to assist in locating defects with the property. It is not intended to be an accurate statement of the true orientation of the building.
The facade of the building faces south.
Note: The facade of the building contains the main entrance door. |
Occupancy Status | Occupied and fully furnished |
Safety Switch | The Consultant has not commented on the presence or otherwise of a safety switch as a qualified electrician is required to ensure that a safety switch is installed and working correctly on all circuits. |
2.1 Areas Included in the Inspection
The inspection covered the readily accessible interior and exterior areas of the Main Building together with the Fences, Yard Structures and Grounds.
Areas Specifically Excluded
| |
2.2 Obstructions Limiting The Inspection
Typically, a Standard Property Inspection and Timber Pest Detection Report is limited by the presence of many obstructions, particularly if the dwelling is occupied and furnished. The Consultant did not move or remove any obstructions which may be concealing evidence of defects including structural damage and timber pest activity.
Areas which were not readily accessible, concealed, obstructed or unsafe were not inspected, including areas above 3.6 meters. Evidence of defects in these areas may only be revealed when the items are removed or access has been provided.
The following table contains the obstructions that typically limit an inspection on an area by area basis.
Yard | Vegetation, structures, motor vehicles, structures built on alignment, stored materials |
Roof Exterior | Vegetation, water heater, solar panels, pool heaters |
Exterior | Vegetation, earth, garden beds, stored goods |
Interior | Furniture, stored goods, carpets, wall hangings, pictures, floor coverings, window curtains and blinds, personal effects, wall linings, builtin fittings, appliances |
Roof Void | Sarking, insulation, low pitch, crowded roof framing, stored goods, restricted access, excessive heat, ac units, water heaters, ducting |
Subfloor | Height restrictions, stored goods, entrapment risk, electrical risk, insufficient crawl space, stored goods, building materials, pipework, formwork, |
This section should be read together with the Terms and Conditions below.
2.3 Risk of Undetected Structural Damage and Timber Pest Assessment
The following table is used to assess the risk of timber pests and structural damage not being detected by this inspection, takeing into account the level of access and obstruction.
Subfloor Space | Partly accessible for inspection (e.g. where there is a part slab & part suspended floor construction or where inspection of the subfloor was made difficult due to the presence of obstructions). |
Yard, Exterior and Interior | Not all areas were "readily accessible" (e.g. where and area is not inspected due to height restrictions) or Inspection made difficult due to the presence of obstructions (e.g. fully furnished). |
Roof Space | Partly accessible for inspection (e.g. where there is a pitched roof combined with a inaccessible flat roof or where the inspection is made difficult due to the presence of obstructions such as insulation sarking or duct work). |
TOTAL POINTS | 6.00 |
RISK | High |
As there are areas within the scope of the inspection that were not readily accessible, there is, in the opinion of the Consultant, a High risk that building defects, termites, borers and fungal decay or conditions that will lead to building defects, termites, borers, and fungal decay were present at the time of the inspection but not identified or reported on.
Therefore, a further inspection prior to purchase is strongly recommended of areas that were not readily accessible, inaccessible or obstructed once access has been provided or the obstruction removed. This may require the moving, lifting or removal of obstructions such as floor coverings, furniture, stored items foliage and insulation. In some instances, it may also require the removal of ceiling and wall linings, and the cutting of traps and access holes. For further advice contact ABIS on 07 3203 4888.
Important Notes:
Conditions conducive to timber pest activity (Termites, Borers and Fungal Decay), timber pest activity and damage associated with such activity may be present in areas that were hidden and/or obstructed at the time of the inspection.
Conditions conducive to structural damage and structural damage may be present in areas that were hidden and/or obstructed at the time of the inspection.
Where evidence of termite activity past or present is reported, there is a high likelihood that damage and mudding exists in areas of the dwelling that were hidden and/or obstructed at the time of the inspection.
3. Safety Issues and Hazards
This Section documents evidence of any item or matter (within the Consultant's expertise) that may constitute a present or imminent serious safety hazard. This should not be viewed however, as an audit or exhaustive list of safety issues relating to the property.
Safey hazards are identified out of a duty of care to those who may use or work on the property. If any of the hazards reported in this section are also a building defect they will also be reported on in the body of the report.
3.1 Identified Hazards
Serious Safety HazardDescription | The bottom rails of the balustrades to the elevated deck/platform/stair have been installed with the rebate facing outwards
Note: This method of installation does not contravene any Australian building code or standard, providing the nails and balusters |
Location | - At The Front Of The Property
|
Recommendation | This condition is considered dangerous. A further investigation by the following trades is strongly recommended to determine the extent of remedial work required. This recommendation should be implemented without delay. |
Photos | |
3.2 Potential Service Hazards and Safety Warnings
No potential services hazards were identified at the time of inspection. |
Most dwellings contain safety critical elements eg: structural fastenings, suspended floors, balconies, decks, stairs and balustrades. As failure of a safety critical element may result in serious injury or death, it is strongly recommended that any safety critical elements in a dwelling be inspected annually.
This report is not an safety audit and the client is warned that hazards and risks to safety may be present now or in the future that are not covered by this report. For their own safety, and as a duty of care to others, all home owners must ensure safety hazards on their properties are eliminated. To assist the home owner in identifying and removing safety hazards, the Consultant recommends the home owner has an annual safety inspection conducted.
Current building codes have specifically addressed past inadequacies in the design of balustrades to raised platforms (decks etc.) and stairs. Whilst there is no legislated requirement to bring older homes up to current standards, we recommend, in the interests of safety, that they be brought up to current standards. All balustrades should be a minimum of 1m high, that no gaps be present in stairs and balustrades be greater than 125mm, and that where a fall of 4m or more exists, the balustrades be non-climbable.
4. Timber Pests
The term Timber Pests covers one or more of the following wood destroying agents which attack timber in service and affect its structural properties:
- Fungal Decay - the microbiological degradation of timber caused by soft rot fungi and decay fungi, but does not include mould, which is a type of fungus that does not structurally damage wood.
- Wood Borers - wood destroying insects belonging to the order "Coleoptera" which commonly attack seasoned timber.
- Termites - wood destroying insects belonging to the order "Isoptera" which commonly attack seasoned timber.
Other insect pests (cockroaches, ants, etc) and vermin (rodents, possums, snakes, etc.) are not timber pests and are not covered by this inspection and report.
4.1 The Property's Susceptibility to Termites
Location Zone | 2.00 Zone C Brisbane Perth |
Age of Suburb | 4.00 Over 70 years |
Distance to Boundary | 0.50 2 to 8 metres |
Wood in Garden and/or Under the House | 1.00 Wood under house and or in the yard |
Timber in Ground Contact | 2.00 Any slab not built to AS3660 |
Timber Type Used in Construction | 1.00 Untreated hardwood heartwood |
Timber Exposure | 1.00 Timber exposed to rain but dry at other times |
TOTAL SCORE | 11.50 |
SUSCEPTIBILITY TO ATTACK | High |
NEXT INSPECTION DUE | 3 Months |
This model is based on the paper: RISK MODEL FOR TERMITE ATTACK IN AUSTRALIA - R.H. Leicester, C-H. Wang & L. J. Cookson - CSIRO
The higher the TOTAL SCORE on the above table, the greater the level of termite protection required and the more frequent termite inspections should be carried out (when no termite management system is in place). In order to manage this risk of termite attack, it is necessary to remove as many conditions conducive to timber pests as possible and or install a termite management system that adequately reduces the risk.
As a guide to which type of termite management system is appropriate, the following table indicates the highest acceptable TOTAL SCORE for each type of Termite Management system (Barrier). This only applies if timber pest inspections are undertaken yearly or more frequently and the maintenance of the barrier is undertaken in accordance with manufacturers' specifications.
Barrier | Maximum acceptable TOTAL SCORE |
---|
Graded crushed stone or glass | 9.5 |
Stainless steel mesh | 10 |
Non-repellent toxic chemical | No Limit |
Repellent chemical | 14 |
No Barrier | 5.5 |
4.2 Evidence of Existing Termite Management
Observations | - No evidence of an existing termite management programme was observed
Note: All relevant documents pertaining to the installation of any previous termite barrier system should be obtained by the building owner and keep on file including, any service warranties and advice in regard to the building owner's obligation to maintain the system. However, subterranean termites can bridge or breach barrier systems and thorough regular inspections of the building are necessary. If evidence of a previous treatment of termite infestation is found, and appropriate documentation is not available, it must be assumed that the termite infestation may still be active in areas of the property not inspected. Accordingly, a re-treatment may be required. If a termite management system appropriate to the risk has not been implement ABIS strongly recommends one be installed without delay. |
Photos | |
Termite Management Systems
A termite management system is a system designed to reduce the risk of termites damaging a structure.
Typically a system consists of one or more of the following:
-
a treated zone created by a termiticidal chemical applied to the soil under or around a building (e.g. Biflex, Premise, Termidor)
-
an inspection zone created by a chemical-physical barrier system (e.g. Kordon, Homeguard)
-
an inspection zone created by a physical barrier system (e.g. Granitgard, TermiMesh, Termiglass)
-
a termite monitoring and baiting system (e.g., Exterra, Nemesis, Sentricon)
These systems are usually installed by a builder/owner as either a precaution (recommended for all homes by the Queensland State government) or in response to past termite activity in a building.
Action to be Taken if Termite Activity Detected on the Property
- Locate the termite activity and eradicate the colony.
-
On confirming that the colony is eradicated, repair any damage that maybe required.
-
Minimize conditions conducive to termite activity such as:
-
lack of adequate subfloor ventilation
-
presence of excessive moisture from defective flashings, downpipes and guttering
-
bridging or breaching of termite management systems
-
storage of timber under/adjacent to the building
-
soil in garden beds built up over weep holes
-
evidence of non-existent or defective termite shields installed to isolated piers
-
check trees or stumps within 50 metres of the building
-
Install a Termite Management System as mentioned above.
-
Have annual termite inspections conducted and ensure that any termite management system is maintained on an ongoing basis
Unfortunatley, as this procedure is not always followed by home owners or bodies corporate, there is a risk that when evidence of past termite treatment or activity exists, termite damage and/or activity may still exist in areas that are hidden or not readily accessible.
If a termite treatment was carried out after the original construction, the client should assume that termite activity or damage exists in areas not inspected and/or obstructed.
4.3 Timber Pest Activity and Conditions Conducive to Timber Pest Activity
This Section covers any timber pest issues. Any evidence of timber pest activity including termites, borers and fungal decay observed by the in spector are detailed in this section. In addition any conditions that create an environments which are likely to lead to timber pest avtivity (Refered to a Conditions Conducive to Timber Pest Activity) is also detailed in this section.
Conditions conducive to timber pest activity should be removed and any timber pests detected should be treated by a timber pest specialist.
Conditions Conducive To Timber Pests - YardWhich Structure | |
Location | |
Element | |
Defect | Earth-wood contact Note: Timber in direct contact with the ground/soil produce a ready food source for termites. Also, susceptible timbers used in a hazardous environment are prone to fungal decay. |
Extent | Widespread |
Photos | |
Condition Conducive to Timber Pest Activity - YardElement | |
Location | - Western side of the building
- Southern side of the building
|
Defect | Poorly Drained.
Poor drainage leads to excessive moisture being retained in the soil which over time can destabilise the foundations and promote timber pest activity such as fungal decay and termites.
Drainage problems are often only discernible during wet periods.
Note: The effect of poor drainage on foundations is often dependent on the soil type. Establishing soil type is beyond the scope of a standard pre-purchase inspection.
Also, timber pest activity including termites and fungal decay are commonly associated with poor drainage.
Generally, to ensure that water drains away from the footings, the profile of the ground adjacent to the building should slope away from the base of the exterior walls and all stormwater drainage should be maintained in good condition and free from blockage.
|
Extent | Widespread |
Photos | |
Conditions Conducive to Timber Pests - ExteriorWhich Building | |
Location | |
Element | |
Defect | Downpipe(s) not connected to stormwater drainage or away from footings. If moisture is allowed to accumulate at the base of walls and near footings it creates a condition that supports timber pest activity and can effect the stability of foundations soils over time. |
Extent | Widespread |
Photos | |
Condition Conducive To Timber Pests - SubfloorWhich Subfloor | - Subfloor space to the main building
|
Area Affected | |
Element | - Sub-floor battens and associated framing
|
Defect | Timber in contact with the ground. Note: Ground contact will raise the moisture content of the timber creating conditions conducive to fungal decay, termites or other timber pests. |
Extent | Widespread |
Photos | |
Condition Conducive To Timber Pests - SubfloorWhich Subfloor | - Subfloor space to the main building
|
Area Affected | |
Element | - Subfloor drainage generally
|
Defect | Poorly Drained.
Poor drainage leads to excessive moisture entering the subfloor area and being retained in the soil which over time can destabilise the foundations and promote timber pest activity such as fungal decay and termites.
Drainage problems are often only discernible during wet periods.
Note: The effect of poor drainage on foundations is often dependent on the soil type. Establishing soil type is beyond the scope of a standard pre-purchase inspection.
Also, timber pest activity including termites and fungal decay are commonly associated with poor drainage.
Generally, to ensure that water drains away from the footings, the profile of the ground adjacent to the building should slope away from the base of the exterior walls and all stormwater drainage should be maintained in good condition and free from blockage.
If the ground level of the subfloor area is fully or partly below the surrounding ground level then well designed retaining walls with appropriate drainage are required to prevent water entering the subfloor area. |
Extent | Widespread |
Photos | |
5. The Yard
The term Yard covers the area of the property outside and around the main dwelling and includes the property's fences, the drainage of the ground around the home and any structures built in the yard such as greenhouses or pool changing rooms.
5.1 Yard Areas Not Inspected
This Section details any yard areas that couldn't be accessed and were not included in the inspection.
All the normally accessible areas permitted entry |
5.2 Yard Structures
Yard Structures are any constructions outside and around the main building.
Yard Structures Inspection Completed |
5.3 Yard Walls and Fences
Yard walls and fences are the boundary walls and fences and other walls and fences within the yard area.
Yard Walls and Fences DefectWhich Structure | |
Location | |
Element | |
Defect | Earth-wood contact
Note: Timber in direct contact with the ground/soil produce a ready food source for termites. Also, susceptible timbers used in a hazardous environment are prone to fungal decay. |
Defect Category | Conditions Conducive to Timber Pests |
Severity | Minor |
Extent | Widespread |
Recommendation | Action is required to remove this condition in order to prevent Timber Pest activity occuring. A further investigation by a Fencing specialist is recommended to determine the extent of work required and associated costs. |
Photos | |
Yard Walls and Fences Inspection Completed |
5.4 Grounds
This Section covers the
ground area outside and around the property
Inspection of trees on the property for disease, stability and soundness is not within the scope of this inspection.
Note: Roots of trees and shrubs
can negatively impact footings by removing moisture from clay soils immediately underneath
the building causing subsidence as the clay shrinks.
In its
search for water, a tree root system can spread a lateral distance equal to the
height of the tree. If in rows or grouped with other trees, the roots may spread
up to twice the height of the tree.
In addition, trees closer
than their mature height may be blown over and/or fall onto and damage
buildings.
Care should be taken when selecting
trees and, as a guide, the trees listed in the table below should not be planted within the
distance of their mature height from the building depending on whether they are to be planted in a line or in a
group.
For further information see: A Simple how to Guide to Preventing Structural Damage
Approximate Mature Tree
Heights
10 to
20m | 20 to 30m | 30m to
60m |
---|
Acacias | But-But | Blue Gum |
English
Elm | Candlebark | Lemon Gum / Figs |
Manna
Gum | Palms | Karri |
Pepper
Tree | Planes | Pines |
Ash | Cedars | Cypress |
Willows | Sheoaks | Poplars |
Yate | Silky Oak | River
Gum |
Yellow Gum | Spotted
Gum | Sugar Gum |
Tree
roots in proximity to a dwelling can also create conditions conducive to the
ingress of termites and termite activity. It is strongly
recommended that any trees too close to a dwelling be removed.
Grounds DefectWhich Area | |
Location | |
Element | |
Defect | - Earth-wood contact Note: Timber in direct contact with the ground/soil produce a ready food source for termites. Also, susceptible timbers used in a hazardous environment are prone to fungal decay.
|
Defect Category | Condition Conducive To Timber Pests |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | The extent was undetermined |
Recommendation | Action is required to remove this condition in order to prevent Timber Pest activity occuring. A further investigation by the following trades is recommended to determine the extent of work required and associated costs.
- Pest Controller (Timber Pest Specialist)
- Landscaper
|
Photos | |
Grounds DefectWhich Area | - Ground around the dwelling
|
Location | - Western side of the building
- Southern side of the building
|
Element | |
Defect | Poorly Drained.
Poor drainage leads to excessive moisture being retained in the soil which over time can destabilise the foundations and promote timber pest activity such as fungal decay and termites.
Drainage problems are often only discernible during wet periods.
Note: The effect of poor drainage on foundations is often dependent on the soil type. Establishing soil type is beyond the scope of a standard pre-purchase inspection.
Also, timber pest activity including termites and fungal decay are commonly associated with poor drainage.
Generally, to ensure that water drains away from the footings, the profile of the ground adjacent to the building should slope away from the base of the exterior walls and all stormwater drainage should be maintained in good condition and free from blockage.
|
Defect Category | Conditions Conducive to both Timber Pest Activity and Structural Damage |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | Widespread |
Recommendation | Action is required to remove conditions conducive to both timber pest activity and structural damage. A further investigation by a drainer is also recommended to determine the extent of work required and associated costs. |
Photos | |
Grounds Inspection Completed |
6. Roof Exterior
6.1 Roof Coverings
The Roof Exterior is the outer covering such as roof tiles, roof sheeting, and the like, together with their fastenings, cappings and flashings.
The roof covering is the primary barrier in preventing rainwater from entering a building and damaging its structure and contents. Regular maintenance of the roof is very important and should be carried out by all home owners.
Inspection of roof coverings by the inspector climbing onto the roof is only performed if the inspector asseses it is safe to do so. Hight, pitch, roofing material, weather conditions etc. affect the type of inspection that can be undertaken.
Type of Roof Covering Inspection
| - An inspection of visible parts of the roof covering was made from ground level. No tests were undertaken.
- The roof covering was not inspected by climbing onto the roof due to height related safety considerations
|
Roof Covering DescriptionWhich Roof | |
Roofing Material | - Roll Formed Metal (Colorbond) Sheeting
- Corrugated (Zincalume) Sheeting
|
7. The Exterior
7.1 Exterior Areas Not Inspected
This Section details any exterior areas that couldn't be accessed and were not included in the inspection.
All the normally accessible exterior areas permitted access |
7.2 Exterior Walls
This Section covers the outer walls of the dwelling viewed from the exterior. External walls can be categorised into Loadbearing and Non-loadbearing. A concrete block construction, for example, is loading bearing and the blocks and mortar are designed to support the roof loads and resist wind forces whereas in a brick- veneer construction the brickwork provides no supporting function and is installed for aesthetics and to keep the weather away from the structural timber or steel frame that supports the roof.
The External Walls of the building were inspected from the ground level. Tests (moisture, probing, sounding etc.) were not carried out on any areas above 3.6 meters.
Note: Where additions such as shade structures or pergolas are to be installed, they should not be attached to external walls without due consideration to the walls' ability to carry the loads being added.
Exterior Wall DescriptionWhich Structure | - Exterior wall to the main building
|
Type Of Construction | |
Cladding | |
Finish | |
Exterior Walls DefectWhich Wall | - Exterior wall to the main building
|
Location | |
Element | |
Defect | - Fungal Decay Activity:
- Indicated by paint discolouration.
- Indicated by visible damage to timber.
- Paint flaking
|
Defect Category | Timber Pest Activity |
Severity | Major - Repairs are likely to involve significant expenditure |
Extent | Widespread |
Recommendation | Action is required to manage the timber pest. A further investigation by the following trades is recommended to determine the extent of work required and associated costs.
|
Photos | |
Exterior Walls Inspection Completed |
7.3 Exterior Windows
This Section covers defects in windows when inspected from the outside.
Tests such as probing were not conducted on any windows above 3.6m
Exterior Windows Inspection Completed |
7.4 Exterior Doors
This Section covers the exterior of External Doors including sliding glass doors if present.
Any doors that are locked or jammed may be concealing defects and/or timber pest activity which may only be revealed when the door can be inspected through its full range of movement.
Exterior Doors Inspection Completed |
7.5 Rainwater Goods - Guttering and Downpipes
Rainwater Goods are roof plumbing that includes eaves gutters, down pipes, spreaders, flashing, spouts, collectors and the like.
Together with the roof covering, rainwater goods collect and direct rainwater away from the dwelling, reducing the risk of rainwater entering a building and damaging its foundations, structure and/or contents. Regular maintenance of rainwater goods, especially keeping gutters free of leaves, is very important and should be carried out regularly by all homeowners.
Rainwater Good DefectWhich Building | |
Location | |
Element | |
Defect | Downpipe(s) not connected to stormwater drainage or away from footings. If moisture is allowed to accumulate at the base of walls and near footings it creates a condition that supports timber pest activity and can effect the stability of foundations soils over time. |
Defect Category | Conditions Conducive to both Timber Pest Activity and Structural Damage |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | Widespread |
Recommendation | Action is required to remove conditions conducive to both timber pest activity and structural damage. A further investigation by a drainer is also recommended to determine the extent of work required and associated costs. |
Photos | |
Rainwater Goods Inspection Completed |
7.6 Exterior Stairs
Exterior Stairs are stairs outside the exterior walls of the building that typically run from the ground level to a landing or raised deck at the first-floor level.
Stairs are a safety critical element and in the interest of safety, current building codes have promoted greatly improved stair design and construction in recent years. Whilst not a legislative requirement, the prudent owner should consider bringing older stairs up to the standards of the current building codes. As a failure of a safety critical element may result in serious injury or death, it is strongly recommended that stairs to a dwelling be inspected annually.
Exterior Stairs Inspection Completed |
7.7 Exterior Platforms (Patios, Porches, Verandahs, Balconies and Decks)
Platform is a generic expression to cover all decks, patios, balconies, verandahs etc. attached to the exterior walls of the dwelling.
Exterior Platforms are safety critical elements. Whilst not a legislative requirement, the prudent owner should consider bringing any older balustrades up to the standards of the current building codes. As a failure of a safety critical element may result in serious injury or death, it is strongly recommended that any exterior platforms to the dwelling be inspected annually.
Exterior Platforms to the building were inspected from the ground level and from on the platform.
Exterior Platform DefectWhich Platform | |
Location | |
Element | |
Defect | - Fungal Decay Activity:
- Indicated by softness of timber surfaces.
- Indicated by rust stains around nail heads.
|
Defect Category | Timber Pest Activity |
Severity | Minor |
Extent | The extent was undetermined |
Recommendation | Action is required to manage the timber pest. A further investigation by the following trades is recommended to determine the extent of work required and associated costs.
|
Photos | |
Exterior Platforms Inspection Completed |
7.8 Other Exterior Primary Elements
Other Exterior Primary Elements are structural elements that are not included in the other exterior Sections above. These were inspected from the ground level.
Other Exterior Primary Elements DefectLocation | |
Defect Element | - Termite Inspection Zone formed by Metal Stirrup and Air Space
- Timber Post
|
Defect | - Bridged by:Bridging Note: "Bridging" is the spanning of a termite barrier or inspection zone so that subterranean termites are provided with passage over or around that barrier.
|
Defect Category | Condition Conducive To Timber Pests |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | The extent was undetermined |
Recommendation | Action is required to remove this condition in order to prevent Timber Pest activity occuring. A further investigation by the following trades is recommended to determine the extent of work required and associated costs.
|
Photos | |
Other Exterior Primary Elements Inspection Completed |
7.9 Other Exterior Secondary and Finishing Elements
Other Exterior Secondary and Finishing Elements are non-structural elements that are not included in the other exterior Sections above and include items such as eaves linings of soffits, barge boards, vent pipes, flashing, water heaters, AC units conduit and the like. These were inspected from the ground level.
Other Exterior Secondary and Finishing Elements Inspection Completed |
8. Roof Void
8.1 Roof Void
This Section covers the roof space and roof frame where house designs that have a pitched roof and an accessible void under the roof covering and above the ceiling of the rooms below. Those roof designs such as flat, skillion and cathedral do not have accessible roof voids and are not inspected.
Roof voids are not designed to be traversed and contain many potential hazards. Anyone considering entering a roof void must only enter when they have assessed it is safe to do so. Safety hazards in roof voids include falling, electrical shock, trip hazards, chemical hazards, dust hazards, impalement hazards, heat stroke, and the like.
Regardless the type of inspection undertaken, inspection of roof voids are always limited by design and obstructions. Consiquently, building defects and timber pest activity may be present in areas that the inspector could not access safely.
Inspection of roof voids by the inspector climbing into the roof void is only performed if the inspector asseses it is safe to do so.
Type of Roof Space InspectionType of Roof Space Inspection | Partly accessible for inspection (e.g. part accessible pitched roof & part flat roof) or Inspection is limited by the presence of obstructions (e.g. insulation, sarking, heavy layers of dust and the like). |
Photos | |
Roof Void DefectWhich Roof Void | - The roof to the main building
|
Location | |
Element | |
Defect | - Corrosion (rust)
- Surface rust
|
Defect Category | Condition Conducive To Structural Damage |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | The extent was undetermined |
Recommendation | Action is required to remove this condition in order to prevent damage to a Structural Element occuring. A further investigation by the following trades is recommended to determine the extent of work required and associated costs.
|
Photos | |
9. The Interior
9.1 Interior Areas Not Inspected
This Section details any interior areas that couldn't be accessed and were not included in the inspection.
All the normally accessible interior areas permitted access |
9.2 The Interior in General
This section contains any comments that apply to the Interior in general
9.3 Ceilings and Cornice
Cornice is the moulding or finishing element covering the intersection between the vertical wall and the horizontal Ceiling.
Ceilings are formed by sheets or boards attached to battens which are in turn attached to ceiling joists or the bottom cords of roof trusses. In newer constructions the ceiling may be attached directly to the bottom cords of trusses.
Ceiling and Cornice Inspection Completed |
9.4 Interior Walls
Interior Walls are both the interior surface of the perimeter loadbearing walls of the building and internal partition walls that may be loadbearing or non-loadbearing.
Interior Walls DefectLocation | |
Element | |
Defect | - Water stains
|
Defect Category | Defect in Secondary or Finishing Element |
Severity | Minor |
Extent | The extent was undetermined |
Recommendation | A further investigation is recommended by the following trades to determine the extent of work required and associated costs.
|
Photos | |
Interior Walls Inspection Completed |
9.5 Floors And Skirtings
Skirtings are the mouldings or finishing elements covering the intersection between the vertical wall and the horizontal floor.
Note: The early signs of termite activity are often detected by sounding (tapping) skirtings. This sounding is only possible where the skirting is not obstructed and there is enough room for the consultant to undertake the sounding process.
Any tiled floors are also sounded for loose and or drummy tiles but only where not obsructed.
Floors and Skirtings Inspection Completed |
9.6 Interior Doors
This Section covers the interior side of external doors including sliding glass doors if present and interior doors including robes and cupboards.
Note:Any doors that are locked or jammed may be concealing defects and/or timber pest activity which may only be revealed when the door can be inspected through its full range of movement.
Interior Doors Inspection Completed |
9.7 Interior Windows
This Section covers the interior side of windows.
Notes:Any windows that are locked or jammed may be concealing defects and/or timber pest activity which may only be revealed when the window can be inspected through its full range of movement.
The early signs of termite activity are often detected by sounding (tapping) timber elements. This sounding is only possible where the window is not obstructed and there is enough room for the consultant to undertake the sounding process.
Interior Windows Inspection Completed |
9.8 Built-in Fittings
Built-in Fittings include all built-in cupboards, vanities, shelving, etc.
Notes:Personal effects, stored goods, doors or drawers that are locked or jammed etc. may be concealing defects and/or timber pest activity which may only be revealed when they can be inspected through their full range of movement.
The early signs of termite activity are often detected by sounding (tapping) and probing. This sounding and probing is only possible where the Built-in Fittings are not obstructed and there is enough room for the consultant to undertake the sounding and probing process.
Builtin Fittings Inspection Completed |
9.9 Other Interior Woodwork
Other Interior Woodwork includes any timber secondary or finishing elements not covered in the Sections above.
Other Interior Woodwork Inspection Completed |
9.10 Sanitary Fittings
Sanitary Fittings refers to the showers, baths, basins, water closets, bidets, etc. commonly found in toilets, bathrooms and en-suites.
The client should be aware that a typical bathroom will have a useful life considerably less than that of the home as a whole. It may often be necessary to renovate bathrooms and wet areas after 20 years and such renovations usually require replacement of the entire bathroom including wall sheeting, waterproofing and tiling. The Consultant only reports on discernible major defects taking into account the age and type of bathroom or wet area. Wear and tear such as calcium deposits, staining, chips and minor cracking associated with age and use may not be reported on especially where the bathroom is nearing the end of its useful life.
It is important to maintain bathrooms and wet areas such as laundries regularly. Silicon sealing should be kept in good repair, and all wet areas should be kept well ventilated. Tiles may become drummy, loose or cracked with time. Tilling and grouting, where present, provide the first level of waterproofing to direct surface water to a waste. Also, as falling sharp wall tiles can be a hazard, tiling should be regularly checked and any loose or drummy tiles replaced or refixed.
Bathrooms and showers are the most common area in a home to be effected by fungal decay and termite activity because the humidity and moisture present create conditions favourable to these timber pests. Keeping wet areas watertight and the house framing free of excessive moisture will assist in keeping your home free from damage. Because of the higher risk of termite activity around bathrooms, we recommend that vents be installed to bath enclosures and wall cavities behind showers to facilitate inspection.
The inspection of sanitary fittings is limited to inspection of visible surface condition. The Consultant will also check behind tap flanges where possible (only where they can be easily unscrewed or retracted against a spring) and where the shower has a tiled base, test the shower base for leaks by temporarily obstructing the waste and filling the shower base to a depth of up to 10mm. The client should be aware that as the shower test only covers a short period, water leaks may not be revealed until a shower has been used for some period of time and surrounding areas checked for excessive moisture.
Sanitary Fittings Inspection Completed |
9.11 Other Interior Detail
Other Interior Detail is any defect not covered in the Sections above.
Other Interior Detail Inspection Completed |
10. Subfloor
10.1 Sub Floor
Subfloor refers to any part of the structure which is below the lowest floor level. In a highset home this is the area under the dwelling. In a slab on ground home it is the concrete slab, its reinforcing steel and other components that form the foundation for the structure.
Subfloor voids under lowset homes are not designed for easy access and contain many potential hazards. Anyone considering entering the subfloor of a low set home should only enter when they have assessed it is safe to do so. Safety hazards in subfloors include electrical shock, trip hazards, chemical hazards, dust hazards, impalement hazards, heat stroke, entrapment, etc.
Inspection by the inspector entering the subfloor space is only performed if the inspector asseses it is safe to do so.
Note:Slab on ground homes do not have an accessible subfloor.
Subfloor AccessSubfloor Space Access | Fully accessible for inspection (e.g. suspended floor with no major obstructions). |
Subfloor DescriptionWhich Subfloor | - Subfloor space to the main building
|
Floor Frame Construction | - Timber framed construction
|
Ground To Floor Construction | - Pre-cast concrete stumps
- Steel columns
- Sawn posts
|
Subfloor DefectWhich Subfloor | - Subfloor space to the main building
|
Area Affected | |
Element | - Sub-floor battens and associated framing
|
Defect | Timber in contact with the ground. Note: Ground contact will raise the moisture content of the timber creating conditions conducive to fungal decay, termites or other timber pests. |
Defect Category | Condition Conducive To both Structural Damage and Timber Pests |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | Widespread |
Recommendation | Action is required to remove this condition in order to prevent Timber Pest activity occuring. A further investigation by a builder is recommended to determine the extent of work required and associated costs. |
Photos | |
Subfloor DefectWhich Subfloor | - Subfloor space to the main building
|
Area Affected | |
Element | - Subfloor drainage generally
|
Defect | Poorly Drained.
Poor drainage leads to excessive moisture entering the subfloor area and being retained in the soil which over time can destabilise the foundations and promote timber pest activity such as fungal decay and termites.
Drainage problems are often only discernible during wet periods.
Note: The effect of poor drainage on foundations is often dependent on the soil type. Establishing soil type is beyond the scope of a standard pre-purchase inspection.
Also, timber pest activity including termites and fungal decay are commonly associated with poor drainage.
Generally, to ensure that water drains away from the footings, the profile of the ground adjacent to the building should slope away from the base of the exterior walls and all stormwater drainage should be maintained in good condition and free from blockage.
If the ground level of the subfloor area is fully or partly below the surrounding ground level then well designed retaining walls with appropriate drainage are required to prevent water entering the subfloor area. |
Defect Category | Condition Conducive To both Structural Damage and Timber Pests |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | Widespread |
Recommendation | Action is required to remove conditions conducive to both timber pest activity and structural damage. A further investigation by a drainer is also recommended to determine the extent of work required and associated costs. |
Photos | |
Subfloor DefectWhich Subfloor | - Subfloor space to the main building
|
Area Affected | - Western side of the building
|
Element | - Sub-floor battens and associated framing
|
Defect | - Termite Activity:
- Indicated by the presence of damage and scouring caused by termites transiting against a timber member A licenced pest controller should be consulted to conduct a further and possibly invasive inspection to establish the extent of activity and treatement options.
|
Defect Category | Timber Pest Activity |
Severity | Minor |
Extent | The extent was undetermined |
Recommendation | Action is required to manage the timber pest. A further investigation by the following trades is recommended to determine the extent of work required and associated costs.
- Pest Controller (Timber Pest Specialist)
|
Photos | |
Subfloor DefectWhich Subfloor | - Subfloor space to the main building
|
Area Affected | |
Element | - Debris on ground
Timber in contact with ground
|
Defect | - Earth-wood contact Note: Timber in direct contact with the ground/soil produce a ready food source for termites. Also, susceptible timbers used in a hazardous environment are prone to fungal decay.
|
Defect Category | Condition Conducive To Timber Pests |
Severity | Moderate - Repairs may involve significant expenditure |
Extent | The extent was undetermined |
Recommendation | Action is required to remove this condition in order to prevent Timber Pest activity occuring. |
Photos | |
11. Terms and Conditions
11.1 Building Maintenance Responsibilities
To help protect against financial loss, it is strongly recommended that:
- Any defects identified in this inspection report be immediately controlled or rectified.
- Conditions conducive to structural damage and timber pest activity be immediately removed, rectified or monitored.
The importance of removing conditions conducive is often not fully appreciated and as a consequence, structural damage and timber pest activity have resulted in subsequent loss. It is also recommended that any high risk areas (e.g. where access was not gained or where areas were concealed by obstructions) be further investigated. Importantly, Standard AS 4349.1 Inspection of Buildings recognises that a standard property report is not a warranty against problems developing with the building in the future. Accordingly, a preventative maintenance program should be implemented for the property which includes systematic inspections, detection and prevention of incipient failure. In respect of timber pests, to help minimise the risk of any future loss, thorough regular inspections should undertaken at intervals not exceeding 12 months or more frequent inspections where the risk of timber pest attack is high or the building type is susceptible to attack. If you require further information on a risk management program, please do not hesitate to contact ABIS on 07 3804 1000.
Building Consultant means a person, business or company who is qualified and experienced to undertake a pre-purchase inspection in accordance with Australian Standard AS 4349.1-2007 "Inspection of Buildings. Part 1: Pre-Purchase Inspections ÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂâÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂÃÂàResidential Buildings". The consultant must also meet any Government licensing requirement, where applicable.
Building & Site (property reporting) means the inspection of the nominated residence together with relevant features including any car accommodation, detached laundry, ablution facilities and garden sheds, retaining walls more than 700 mm high, paths and driveways, steps, fencing, earth, embankments, surface water drainage and stormwater run-off within 30 m of the building, but within the property boundaries.
Building & Site (timber pest reporting) means the main building (or main buildings in the case of a building complex) and all timber structures (such as outbuildings, landscaping, retaining walls, fences, bridges, trees, tree stumps and timber embedded in soil) and the land within the property boundaries up to a distance of 50 metres from the main building(s).
Chemical Delignification means the breakdown of timber through chemical action.
Client means the person or persons, for whom the Report was carried out or their Principal (i.e. the person or persons for whom the report is being obtained).
Conditions Conducive to Structural Damage means noticeable building deficiencies or environmental factors that may contribute to the occurrence of Structural Damage.
Conditions Conducive to Timber Pest Activity means noticeable building deficiencies or environmental factors that may contribute to the presence of Timber Pests. Where Conditions Conducive to Timber Pest Activity are present and structural elements are involved, then Conditions Conducive to Structural Damage should also be considered present.
Finishing Elements means the fixtures, fittings and finishes applied or affixed to Primary Elements and Secondary Elements such as baths, water closets, vanity basins, kitchen cupboards, door furniture, window hardware, render, floor and wall tiles, trim or paint. The term "Finishing Elements" does not include furniture or soft floor coverings such as carpet and linoleum.
Incomplete Construction means where the original construction and any alterations or additions to the building are not complete in the work synonymous with construction (but does not include building services).
Instrument Testing (timber pest reporting) means where appropriate, the carrying out of Tests using the following techniques and instruments:
- electronic moisture detecting meter - an instrument used for assessing the moisture content of building elements
- thermal imaging camera - an instrument used to provide a thermal map of the heat energy radiated from visible surfaces to aid the detection of excessive moisture and termite activity
- probing - a technique where timber and other materials/areas are penetrated with a sharp instrument (e.g. bradawl or pocket knife), but does not include probing of decorative timbers or finishes, or the drilling of timber and trees
- sounding - a technique where timber is tapped with a solid object
Major Defect means defect of significant magnitude where rectification has to be carried out in order to avoid unsafe conditions, loss of utility or further deterioration of the property.
Minor Defect means defect other than a Major Defect.
No Defects Were Observed means that when comparing the inspected building with a typical example of its type and age, no defects, other than wear and tear normally associated with the ravages of time, were deemed by the inspector to warrant description and reporting. In older homes minor defects are not reported on in detail.
Primary Elements means those parts of the building providing the basic loadbearing capacity to the Structure, such as foundations, footings, floor framing, loadbearing walls, beams or columns. The term "Primary Elements" also includes other structural building elements including:
- those that provide a level of personal protection such as handrails
- floor-to-floor access such as stairways
- the structural flooring of the building such as floorboards
Readily Accessible Areas means:
- areas which can be easily and safely inspected without injury to person or property
- are up to 3.6 metres above ground or floor levels
- in roof spaces where the minimum area of accessibility is not less than 600 mm high by 600 mm wide
- subfloor spaces where the minimum area of accessibility is not less than 400 mm high by 600 mm wide providing the spaces or areas permit safe entry.
The term "readily accessible" also includes:
- accessible subfloor areas on a sloping site where the minimum clearance is not less than 150 mm high, provided that the areas is not more than 2 metres from a point with conforming clearance (i.e. 400 mm high by 600 mm wide)
- areas at the eaves of accessible roof spaces that are within the consultant's unobstructed line of sight and within arm's length from a point with conforming clearance (i.e. 600 mm high by 600 mm wide)
Secondary Elements means those parts of the building not providing loadbearing capacity to the Structure, or those non-essential elements which, in the main, perform a completion role around openings in Primary Elements and the building in general such as non-loadbearing walls, partitions, wall linings, ceilings, chimneys, flashings, windows, glazing or doors.
Serious Safety Hazard means any item that may constitute an immediate or imminent risk to life, health or property. Occupational, health and safety or any other consequence of these hazards has not been assessed.
Structural Damage means a significant impairment to the integrity of the whole or part of the Structure falling into one or more of the following categories:
- Structural Cracking and Movement - major (full depth) cracking forming in Primary Elements resulting from differential movement between or within the elements of construction, such as foundations, footings, floors, walls and roofs
- Deformation - an abnormal change of shape of Primary Elements resulting from the application of load(s)
- Dampness - the presence of moisture within the building, which is causing consequential damage to Primary Elements
- Structural Timber Pest Damage - structural failure, i.e. an obvious weak spot, deformation or even collapse of timber Primary Elements resulting from attack by one or more of the following wood destroying agents: chemical delignification; fungal decay; wood borers; and termites
Structure means the load bearing part of the building, comprising the Primary Elements.
Subterranean Termite Management Proposal means a written proposal in accordance with Australian Standard AS 3660.2 to treat a known subterranean termite infestation and/or manage the risk of concealed subterranean termite access to buildings and structures.
Tests (property reporting) means where appropriate, the carrying out of tests using the following procedures and instruments:
- Dampness Tests - additional attention to the visual examination was given to those accessible areas which the consultant's experience has shown to be particularly susceptible to damp problems. Instrument testing using electronic moisture detecting meter of those areas and other visible accessible elements of construction showing evidence of dampness was performed.
- Physical Tests - the following physical actions undertaken by the consultant: opening and shutting of doors, windows and drawers; operation of taps; water testing of shower recesses; and the tapping of tiles and wall plaster.
Tests (timber pest reporting) means additional attention to the visual examination was given to those accessible areas which the consultant's experience has shown to be particularly susceptible to attack by Timber Pests. Instrument Testing of those areas and other visible accessible timbers/materials/areas showing evidence of attack was performed.
Timber Pest Activity means telltale signs associated with "active" (live) and/or "inactive" (absence of live) Timber Pests at the time of inspection. The term "Timber Pest Activity" also includes timber pest damage i.e. noticeable impairments to the integrity of timber and other susceptible materials resulting from attack by Timber Pests. Where Timber Pest Activity is present and structural elements are involved, then Structural Damage should also be considered present.
Timber Pest Detection Consultant means a person who meets the minimum recommended competency standard set out in Australian Standard AS 4349.3 Inspections of Buildings. Part 3: Timber Pest Inspection Reports.
Timber Pests means one or more of the following wood destroying agents which attack timber in service and affect its structural properties:
- Fungal Decay - the microbiological degradation of timber caused by soft rot fungi and decay fungi, but does not include mould, which is a type of fungus that does not structurally damage wood.
- Wood Borers - wood destroying insects belonging to the order "Coleoptera" which commonly attack seasoned timber.
- Termites - wood destroying insects belonging to the order "Isoptera" which commonly attack seasoned timber.
As requested and agreed with the Client, the inspection carried out by a qualified Building Consultant and Timber Pest Detection Consultant ("The Consultant") is a combined Property Report & Timber Pest Report ("The Report").
The Terms on which this Report was prepared are set out in the following sub-sections: